Warning
Some papers have malformed authors, please correct this before using these references.
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.
Favourites
For Word
[n] J. H. Yeck, “Big Science Projects - What is it that makes some a success and others to fail?”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 4099-4102. doi:10.18429/JACoW-IPAC2014-WEIB05
[n] Y.R.Martin, S.Coda, B.P.Duval, X.Llobet, J.-M.Moret, “A new plant control software for the TCV tokamak”, in Proc. ICALEPCS'05, Geneva, Switzerland, Oct. 2005, paper P1_083.
[n] Wilhelm Kriens, “PETRA Bunch Rotation”, in Proc. PAC'97, Vancouver, Canada, May 1997, paper 8P009, pp. 231-233.
[n] N/A, “N/A”, in Proc. SRF'11, Chicago, IL, USA, Jul. 2011, paper THPO058, pp. XX-XX.
[n] R.Krempaska,A.Bertrand,M.Dach,D.Vermeulen,D.Zimoch, “SLS Control System Software Management”, in Proc. ICALEPCS'05, Geneva, Switzerland, Oct. 2005, paper P1_085.
[n] N/A, “N/A”, in Proc. SRF'11, Chicago, IL, USA, Jul. 2011, paper THPO042, pp. XX-XX.
[n] A. Papanestis, “The LHCb RICH Detector Control System.”, in Proc. ICALEPCS'09, Kobe, Japan, Oct. 2009, paper TUP111, pp. 340-342.
[n] D.Bolkhovityanov,N.Lebedev,A.Starostenko,A.Tsyganov, “Design and Development of a Control System for Intence Source of Radioactive Ions Prototype”, in Proc. ICALEPCS'05, Geneva, Switzerland, Oct. 2005, paper P1_091.
[n] Ilan Ben-Zvi, Jialin Xie, Renshan Zhang, “Feed Forward RF Control System of the Accelerator Test Facility”, in Proc. PAC'91, San Francisco, CA, USA, May 1991, pp. 1323-1326.
[n] T. B. J. Mouille, “Transient Magnetodynamic Finite Element Analysis of the ISIS M25/2 10Hz Kicker Magnet”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 1313-1315. doi:10.18429/JACoW-IPAC2014-TUPRO112
[n] M. C. Johnson, “Beamline Insertions Manager at Jefferson Lab”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 1253-1255. doi:10.18429/JACoW-IPAC2015-MOPWI044
[n] A. Johnstone, “Optics and Field Error Compensation in the FNAL Permanent Magnet 8.9 GeV/c Proton Transfer Line”, in Proc. PAC'97, Vancouver, Canada, May 1997, paper 8P012, pp. 240-242.
For LaTeX
Use Complete Form
For BibTeX
References
- J. H. Yeck, “Big Science Projects - What is it that makes some a success and others to fail?”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 4099-4102.
- Y.R.Martin, S.Coda, B.P.Duval, X.Llobet, J.-M.Moret, “A new plant control software for the TCV tokamak”, in Proc. 10th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'05), Geneva, Switzerland, Oct. 2005, paper P1_083.
- Wilhelm Kriens, “PETRA Bunch Rotation”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 8P009, pp. 231-233.
- N/A, “N/A”, in Proc. 15th Int. Conf. RF Superconductivity (SRF'11), Chicago, IL, USA, Jul. 2011, paper THPO058, pp. XX-XX.
- R.Krempaska,A.Bertrand,M.Dach,D.Vermeulen,D.Zimoch, “SLS Control System Software Management”, in Proc. 10th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'05), Geneva, Switzerland, Oct. 2005, paper P1_085.
- N/A, “N/A”, in Proc. 15th Int. Conf. RF Superconductivity (SRF'11), Chicago, IL, USA, Jul. 2011, paper THPO042, pp. XX-XX.
- A. Papanestis, “The LHCb RICH Detector Control System.”, in Proc. 12th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'09), Kobe, Japan, Oct. 2009, paper TUP111, pp. 340-342.
- D.Bolkhovityanov,N.Lebedev,A.Starostenko,A.Tsyganov, “Design and Development of a Control System for Intence Source of Radioactive Ions Prototype”, in Proc. 10th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'05), Geneva, Switzerland, Oct. 2005, paper P1_091.
- Ilan Ben-Zvi, Jialin Xie, Renshan Zhang, “Feed Forward RF Control System of the Accelerator Test Facility”, in Proc. 14th Particle Accelerator Conf. (PAC'91), San Francisco, CA, USA, May 1991, pp. 1323-1326.
- T. B. J. Mouille, “Transient Magnetodynamic Finite Element Analysis of the ISIS M25/2 10Hz Kicker Magnet”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 1313-1315.
- M. C. Johnson, “Beamline Insertions Manager at Jefferson Lab”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1253-1255.
- A. Johnstone, “Optics and Field Error Compensation in the FNAL Permanent Magnet 8.9 GeV/c Proton Transfer Line”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 8P012, pp. 240-242.
Back to search