Warning
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.
Favourites
For Word
[n] R. A. Marsh, M. A. Shapiro, and R. J. Temkin, “Metallic Photonic Band Gap Accelerator Structure Experiments and Design”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPP151, pp. 2841-2843.
[n] F. Y. Wang, C. Adolphsen, J. P. Eichner, C. D. Nantista, and L. Xiao, “Experimental Study of Surface RF Magnetic Field Enhancement Caused by Closely Spaced Protrusions”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 3949-3951. doi:10.18429/JACoW-IPAC2014-THPRI078
[n] S. Orth and H. Klingbeil, “System Identification Procedures for Resonance Frequency Control of SC Cavities”, in Proc. ERL'19, Berlin, Germany, Sep. 2019, pp. 129-133. doi:10.18429/JACoW-ERL2019-THCOWBS03
[n] H. Lutz and D. Anicic, “Database Driven Control System Configuration for the PSI Proton Accelerator Facilities”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper MOPMN022, pp. 289-291.
[n] T. S. Dixit, Y. Shimosaki, and K. Takayama, “Adiabatic Damping of the Bunch-length in the Induction Synchrotron”, in Proc. APAC'07, Indore, India, Jan.-Feb. 2007, paper TUPMA099, pp. 244-246.
[n] P. Jines and B. Craft, “PLC Based Upgrades for the CAMD Linac and Storage Ring Control System”, in Proc. ICALEPCS'01, San Jose, CA, USA, Nov. 2001, paper WEAP037, pp. XX-XX.
[n] R. I. Saban et al., “Coordination of the Commissioning of the LHC Technical Systems”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper MOPC118, pp. 340-342.
[n] S. T. Boogert et al., “Cavity Beam Position Monitor System for ATF2”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper MOPE070, pp. 1140-1142.
[n] J. HANNIER, A. GAVELLO, R. DOAZAN, and J.-P. AIRIAU, “Managing obsolescence of alignment control system on the Laser Megajoule facility”, in Proc. ICALEPCS'25, Chicago, IL, USA, Sep. 2025, pp. 280-285. doi:10.18429/JACoW-ICALEPCS2025-TUBR003
For LaTeX
Use Complete Form
For BibTeX
References
- R. A. Marsh, M. A. Shapiro, and R. J. Temkin, “Metallic Photonic Band Gap Accelerator Structure Experiments and Design”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP151, pp. 2841-2843.
- F. Y. Wang, C. Adolphsen, J. P. Eichner, C. D. Nantista, and L. Xiao, “Experimental Study of Surface RF Magnetic Field Enhancement Caused by Closely Spaced Protrusions”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3949-3951.
- S. Orth and H. Klingbeil, “System Identification Procedures for Resonance Frequency Control of SC Cavities”, in Proc. 63rd Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'19), Berlin, Germany, Sep. 2019, pp. 129-133.
- H. Lutz and D. Anicic, “Database Driven Control System Configuration for the PSI Proton Accelerator Facilities”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper MOPMN022, pp. 289-291.
- T. S. Dixit, Y. Shimosaki, and K. Takayama, “Adiabatic Damping of the Bunch-length in the Induction Synchrotron”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper TUPMA099, pp. 244-246.
- P. Jines and B. Craft, “PLC Based Upgrades for the CAMD Linac and Storage Ring Control System”, in Proc. 8th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'01), San Jose, CA, USA, Nov. 2001, paper WEAP037, pp. XX-XX.
- R. I. Saban et al., “Coordination of the Commissioning of the LHC Technical Systems”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC118, pp. 340-342.
- S. T. Boogert et al., “Cavity Beam Position Monitor System for ATF2”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPE070, pp. 1140-1142.
- J. HANNIER, A. GAVELLO, R. DOAZAN, and J.-P. AIRIAU, “Managing obsolescence of alignment control system on the Laser Megajoule facility”, in Proc. 20th International Conference on Accelerator and Large Experimental Control Systems (ICALEPCS'25), Chicago, IL, USA, Sep. 2025, pp. 280-285.
Back to search