[n] N. Krupka et al., “Quality Control at the TTF-Cleanroom Infrastructure for Cavity-Processing”, in Proc. SRF'03, Lübeck, Germany, Sep. 2003, paper TUP18, pp. 322-326.
[n] K. Eppley et al., “Operation of a 1.3 GHz, 10 MW Multiple Beam Klystron”, in Proc. LINAC'04, Lübeck, Germany, Aug. 2004, paper THP39, pp. 693-693.
Use Complete Form